Prime Minister Shahid Khaqan Abbasi, after a high-level meeting in Karachi on Monday, directed the Sui Southern Gas Company (SSGC) to supply as much gas as required by K-Electric (KE) to provide electricity to the city.

The special meeting of the Cabinet Committee on Energy (CCoE) was called to resolve the dispute between the SSGC and KE which has led to the city suffering from load-shedding.

“The city will have electricity as well as water, as water is supplied using electricity,” Abbasi said, adding that Adviser to Prime Minister on Finance Miftah Ismail has been tasked with determining within 15 days what dues are owed by which company.

“The load-shedding in Karachi will end completely when 100 per cent of the bills are being paid,” the prime minister said in response to a question.

SHARE

LEAVE A REPLY